Scott & SteelWarm roofs for conservatories Book a survey

Glass off. Warm roof on.

Scott & Steel specialise in one job: replacing the roof on a conservatory you already own.

The tiled warm roof

Your old glass or polycarbonate roof comes off. An insulated, tiled roof goes on, and the inside is plastered like any other room. Add spotlights and roof windows and it stops feeling like a conservatory.

  • Warmer in winter, cooler in summer
  • Plastered ceiling with spotlights
  • Roof windows where you want daylight
  • Backed by a 10-year insured guarantee (their claim)
Plan a tiled roof
Conservatory on a bungalow with a new tiled roof
Inside a finished conservatory with roof windows and a plastered ceiling

The flat GRP roof

Sometimes a tiled roof simply is not an option because of the pitch of your existing roof. Scott & Steel's answer is a GRP flat roof with the same insulation, a plastered ceiling and the same guarantee.

  • For low pitches where tiles will not work
  • Same insulation system as the tiled roof
  • Roof windows fit here too
Plan a flat roof

What is in the roof?

Tap a layer. This is a typical build-up. Scott & Steel will confirm their exact spec at the survey.

Lightweight tilesInsulated roof panelFrame and supportsPlastered ceilingSpotlights and roof windows

Also on the list

Box gutters fixed

Leaking box gutters can be removed and the problem designed out with a bespoke roof shape.

New glass units

Their site offers free fitting on replacement glass units when you have the roof done.

Electrics and decorating

The team project-manages design, installation, electrics and painting, so you deal with one firm.

Guide prices Estimates

Scott & Steel do not publish prices. These bands are a guide from typical UK warm-roof work, so you know the scale before you ask. Only a survey gives a real quote.

ConservatoryTiled warm roofGRP flat roof
Small, about 3m x 3m£4,200 to £6,200£4,200 to £5,600
Average, about 4m x 3.5m£7,800 to £11,800£6,000 to £9,000
Large, about 5m x 4m£11,200 to £15,200£8,600 to £11,800

Plastered ceiling and spotlights are included. Roof windows, glass units and electrics are extra. The planner adds them up.

Questions people ask

How long does it take?
Customers describe three days to a week, depending on the size and how much plastering, electrics and finishing they add.
Do I need permission?
A solid roof usually has to meet Building Regulations even when planning permission is not needed. Ask Scott & Steel how they handle this at the survey.
Will I lose the light?
Not if you add roof windows. Many of their finished rooms have two or more.
What if my roof pitch is too low?
That is what the GRP flat roof is for.
What does the guarantee cover?
They advertise a 10-year insured-backed guarantee. Ask for the paperwork at survey: who insures it and what it covers.

Not sure which roof?

Book a survey and they will tell you.

CallWhatsAppSurvey